Application: | Industrial |
---|---|
Speed: | High Speed |
Number of Stator: | Three-Phase |
Function: | Driving |
Casing Protection: | Explosion-Proof Type |
Number of Poles: | 2 |
Pemasok dengan izin usaha terverifikasi
Contoh | Gaya eksitasi maksimum (N) | Kecepatan tetapan (rpm) |
Daya tetapan (KW) | Saat ini (A) |
Tegangan (V) |
Dimensi pemasangan (mm) | Dimensi keseluruhan (mm) | Berat (Kg) |
|||||||
A | B | H | K | AB | BB | HB | G | L | |||||||
Y ZU-1-2 | 1000 | 2860 | 0.09 | 0.42 | 380 | 130 | 80 | 80 | 12 | 170 | 140 | 154 | 16 | 260 | 13 |
Y ZU-1.5-2 | 1500 | 2860 | 0.15 | 0.5 | 380 | 130 | 80 | 80 | 12 | 170 | 140 | 154 | 16 | 360 | 13.5 |
Y ZU-2-2 | 2000 | 2860 | 0.18 | 0.54 | 380 | 130 | 80 | 80 | 12 | 170 | 140 | 154 | 16 | 250 | 14 |
Y ZU-2.5-2 | 2500 | 2860 | 0.2 | 0.55 | 380 | 130 | 80 | 80 | 12 | 170 | 140 | 154 | 15 | 260 | 19 |
Y ZU-3-2 | 3000 | 2860 | 0.25 | 0.6 | 380 | 150 | 90 | 90 | 14 | 185 | 150 | 172 | 18 | 280 | 20 |
Y ZU-5-2 | 5000 | 2860 | 0.37 | 0.9 | 380 | 150 | 90 | 90 | 14 | 185 | 150 | 172 | 18 | 280 | 21 |
Y ZU-8-2 | 8000 | 2860 | 0.75 | 1.75 | 380 | 180 | 110 | 112 | 18 | 220 | 180 | 230 | 18 | 340 | 36 |
Y ZU-10-2 | 10000 | 2860 | 0.75 | 1.75 | 380 | 180 | 110 | 112 | 18 | 220 | 180 | 230 | 18 | 340 | 37 |
Y ZU-15-2 | 15000 | 2860 | 1.1 | 2.3 | 380 | 220 | 140 | 120 | 22 | 270 | 225 | 260 | 25 | 415 | 47 |
Y ZU-20-2 | 20000 | 2860 | 1.5 | 3.1 | 380 | 260 | 150 | 140 | 26 | 320 | 280 | 310 | 28 | 445 | 80 |
Y ZU-1.5-4 | 1500 | 1440 | 0.15 | 0.5 | 380 | 130 | 80 | 80 | 12 | 170 | 140 | 154 | 16 | 250 | 15 |
Y ZU-2-4 | 2000 | 1440 | 0.15 | 0.5 | 380 | 130 | 80 | 80 | 12 | 170 | 140 | 154 | 16 | 260 | 15.5 |
Y ZU-2.5-4 | 2500 | 1440 | 0.18 | 0.6 | 380 | 150 | 90 | 90 | 14 | 185 | 150 | 172 | 18 | 280 | 21 |
Y ZU-3-4 | 3000 | 1440 | 0.18 | 0.6 | 380 | 150 | 90 | 90 | 14 | 185 | 150 | 172 | 18 | 280 | 23 |
Y ZU-5-4 | 5000 | 1440 | 0.25 | 0.75 | 380 | 180 | 110 | 112 | 18 | 220 | 180 | 230 | 25 | 340 | 37 |
Y ZU-8-4 | 8000 | 1440 | 0.55 | 1.5 | 380 | 220 | 140 | 120 | 22 | 265 | 225 | 266 | 25 | 415 | 48 |
Y ZU-104 | 10000 | 1440 | 0.55 | 1.5 | 380 | 220 | 140 | 120 | 22 | 265 | 225 | 266 | 28 | 415 | 49 |
Y ZU-15-4 | 15000 | 1440 | 0.75 | 1.9 | 380 | 260 | 150 | 140 | 26 | 310 | 245 | 303 | 28 | 450 | 77 |
Y ZU-20-4 | 20000 | 1440 | 11 | 2.6 | 380 | 260 | 150 | 140 | 26 | 310 | 245 | 303 | 28 | 450 | 82 |
Y ZU-30-4 | 30000 | 1440 | 15 | 3.6 | 380 | 310 | 170 | 160 | 33 | 380 | 285 | 356 | 30 | 536 | 130 |
Y ZU-50-4 | 50000 | 1440 | 22 | 5.1 | 380 | 350 | 220 | 190 | 39 | 440 | 350 | 410 | 35 | 608 | 180 |
Y ZU-3-6 | 3000 | 930 | 0.25 | 0.84 | 380 | 180 | 110 | 112 | 18 | 220 | 180 | 220 | 18 | 340 | 39 |
Y ZU-5-6 | 5000 | 930 | 0.37 | 1.2 | 380 | 220 | 140 | 120 | 22 | 265 | 225 | 266 | 25 | 415 | 50 |
Y ZU-8-6 | 8000 | 930 | 0.75 | 2.2 | 380 | 260 | 150 | 140 | 26 | 310 | 245 | 305 | 28 | 450 | 80 |
Y ZU-10-6 | 10000 | 930 | 0.75 | 2.2 | 380 | 260 | 150 | 140 | 26 | 310 | 245 | 305 | 28 | 450 | 83 |
Y ZU-15-6 | 15000 | 930 | 11 | 3.1 | 380 | 310 | 170 | 160 | 33 | 380 | 285 | 356 | 30 | 536 | 136 |
Y ZU-20-6 | 20000 | 930 | 15 | 4 | 380 | 310 | 170 | 160 | 33 | 380 | 285 | 356 | 35 | 536 | 140 |
Y ZU-30-6 | 30000 | 930 | 22 | 5.6 | 380 | 350 | 220 | 190 | 39 | 440 | 350 | 410 | 30 | 608 | 190 |
Y ZU-50-6 | 50000 | 930 | 3.7 | 8.4 | 380 | 380 | 250 | 220 | 33(45) | 446 | 340 | 425 | 40 | 615 | 230 |
Y ZU-75-6 | 75000 | 930 | 5.5 | 11 | 380 | 440 | 280 | 240 | 36(52) | 550 | 550 | 520 | 40 | 790 | 435 |
Y ZU-100-6 | 100000 | 930 | 7.5 | 15 | 380 | 440 | 140 | 260 | 6-45 | 640 | 690 | 590 | 40 | 890 | 515 |
Y ZU-140-6 | 140000 | 930 | 10 | 22 | 380 | 480 | 140 | 280 | 8-45 | 710 | 77 | 640 | 50 | 950 | 556 |
Y ZU-10-8 | 10000 | 720 | 0.75 | 24 | 380 | 310 | 170 | 160 | 33 | 380 | 285 | 356 | 30 | 536 | 145 |
Y ZU-20-8 | 20000 | 720 | 15 | 4.3 | 380 | 350 | 220 | 190 | 39 | 440 | 350 | 410 | 35 | 60 | 210 |
Setelah Anda memesan dan membayar deposit, kami akan mulai mengatur produksi dan menghubungi agen transportasi angkutan angkutan angkutan laut untuk memesan tempat tersebut. Dua hari sebelum akhir produksi, Anda harus menyelesaikan pembayaran akhir. Lalu, kami beritahukan kepada perusahaan angkutan kargo laut bahwa mereka siap untuk datang ke pabrik untuk menarik barang-barang ke pelabuhan. Pada hari pengiriman, kami akan mengirim video dan gambar pabrik kepada pelanggan, dan menandai nama Inggris yang sesuai untuk setiap produk dan komponen produk dengan penanda untuk mencegah pelanggan tidak mengetahui setiap suku cadang yang diberikan setelah menerima barang. Pada saat yang sama, kami akan memasukkan versi Inggris dari produk tersebut yang ada di kotak kargo. Kami biasanya memilih penerus pengiriman dengan harga preferensial untuk pelanggan yang mengantarkan barang untuk Anda. Metode pengiriman bisa berupa FOB atau CIF. Anda juga dapat memilih EXW, lalu menghubungi sendiri perusahaan agen barang.
Pemasok dengan izin usaha terverifikasi