Material: | Steel |
---|---|
Type: | Fixed |
Structural Style: | Tower Scaffolding |
Framework: | Combined Scaffolding |
Supporting Mode: | Projecting Scaffolding |
Lapping Form: | Full Scaffolding |
Pemasok dengan izin usaha terverifikasi
Dasar POST C60 |
C60 0,3m POST |
C60,50 post |
C60 0,75m post |
C60 1.0m post |
C60 2,0m POST |
Segitiga 1,5 m |
Segitiga C60 0,7 m. |
Base Jack C60/600 |
K0 u head jack 750 |
C60 U HEAD TF |
C60/1400 teleskopik POST |
Post dapat disetel C60 |
Strut 0,35m |
0,5strut |
Strut 0,7 m. |
Strut 1,0m |
Strut 1,5 m |
Strut 2.0m |
Strut 2.5m |
Strut 3.0m |
BRACE H2*L0,7 m. |
* |
BRACE H2*1,5 m. |
BRACE H2*2.0m |
BRACE H2*3m |
Pemasok dengan izin usaha terverifikasi