Tipe: | kabel campuran |
---|---|
Bentuk: | Bundar |
Sertifikasi: | TUV, ISO, CE |
dimensi: | disesuaikan |
kemurnian: | 99.99%,99.9% |
aplikasi: | lapisan aspal |
Pemasok dengan izin usaha terverifikasi
Elemen | Aktual | Spesifikasi | Satuan | Elemen | Aktual | Spesifikasi | Satuan | Elemen | Aktual | Spesifikasi | Satuan |
Li | 2 | ppm | ZN | 1 | ppm | Pb | 8 | ppm | |||
B | ppm | GA | ppm | BI | 5 | ppm | |||||
F | ppm | GE | ppm | Y | ppm | ||||||
Tidak tersedia | ppm | AS | 1 | ppm | Th | ppm | |||||
Mg | 1 | ppm | Se | 3 | ppm | Er | ppm | ||||
Al | ppm | ZR | ppm | RU | ppm | ||||||
Si | 5 | ppm | Jml | ppm | Kanan | ppm | |||||
P | ppm | MO | 2 | ppm | OS | ppm | |||||
CL | ppm | PD | 5 | ppm | Cs | ppm | |||||
K | ppm | AG | Matrix | wt% | CD | 1 | ppm | ||||
CA | 1 | ppm | SN | 5 | ppm | ||||||
TI | ppm | SB | 5 | ppm | |||||||
V | ppm | BA | 1 | ppm | |||||||
CR | 1 | ppm | HF | ppm | |||||||
MN | 1 | ppm | TA (TA) | ppm | C | 5 | ppm | ||||
FE | 2 | ppm | W | ppm | S | 5 | ppm | ||||
Co | 1 | ppm | PT. | 5 | ppm | O | 20 | ppm | |||
NI | 2 | ppm | AU | 5 | ppm | N | 5 | ppm | |||
CU | 3 | ppm | Hg | ppm | H | ppm |
1. Apakah Anda perusahaan atau pabrikan?
Xinkel: Kami adalah seorang pabrikan profesional yang mengkhususkan diri di bidang ini selama lebih dari 10 tahun.
Target Campuran Besi, Feby Co Spid
2: Berapa lama waktu pengiriman Anda?
Proses in Xinkel : pengiriman bisa dilakukan dalam waktu 5-7 hari dengan ukuran yang teratur, atau contoh-contoh, dan 15-20 hari untuk jumlah batch.
Target Campuran Besi, Feby Co Spid
3: Apakah Anda memiliki MOQ ?
Xininkang: Tidak, kami pun mendukung sample.
Target Campuran Besi, Feby Co Spid
4: Apa metode pembayaran Anda?
Xinkel: T/T di muka, Paypal , Western Union, dan sebagainya
Target Campuran Besi, Feby Co Spid
Selamat datang di kontak kami setiap saat!
Pemasok dengan izin usaha terverifikasi