Formwork Hijau Cepat Efisien dan Mudah Mengoperasikan Formwork Slab untuk Flatslab
Rincian Produk
| Kustomisasi: | Tersedia |
|---|---|
| Sertifikasi: | sertifikat paten |
| Bahan: | Kayu besi |
Anggota Berlian Harga mulai 2008
Pemasok dengan izin usaha terverifikasi
Diaudit oleh lembaga inspeksi pihak ketiga yang independen
Importir dan Eksportir
Pilihan Pembeli Berulang Tinggi
Pengalaman Ekspor Bertahun-tahun
Pelopor Multi-Bahasa
Pemasok memiliki hak impor dan ekspor
Lebih dari 50% pembeli berulang kali memilih pemasok
Pengalaman ekspor pemasok lebih dari 10 tahun
2 bahasa yang digunakan secara bebas oleh staf perdagangan luar negeri. termasuk: English, Japanese
Masuk untuk melihat semua label kekuatan terverifikasi (26)
Temukan Produk Serupa
Informasi dasar
- Tidak. Model.
- QS GF
- Tipe
- Formwork slab
- Paket Transportasi
- dalam bundel atau lainnya
- Spesifikasi
- ukuran berbeda
- Merek Dagang
- qs gf
- Asal
- Shandong, China
- Kode HS
- 7308
- Kapasitas Produksi
- 400 ton/bulan
Deskripsi Produk
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.

Company Introduction
Our company "QINGDAO SCAFFOLDING CO.,LTD." is one of the biggest manufacturers in whole China
If you have any inquiry about scaffolding or formwork products,please feel free to contact me.
QINGDAO SCAFFOLDING CO.,LTD.
Best Regards/Cherry Wei
M: 0086-13355422605
TEL: +86-532-8668 1339
FAX: +86-532-8579 8559
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.

Company Introduction
Our company "QINGDAO SCAFFOLDING CO.,LTD." is one of the biggest manufacturers in whole China
for scaffolding products and formwork items. We export large quantity to Europe, Australia, New Zealand, U.S.A., Canada, South America and African countries. More than 20 years experience of manufacturing on scaffolding has won our customers approval and satisfaction.
Please be advised the main products which we are producing:
1)SCAFFOLDING COUPLERS;
2)SCREW JACKS;
3)RINGLOCK SYSTEMS;
4)KWIKSTAGE SYSTEMS;
5)HAKI SYSTEMS;
6)PROPS
7)FORMWORK AND FORMWORK ACCESSORIES;
8)SCAFFOLD TUBES(PIPES)
9)STEEL FORMWORK
If you have any inquiry about scaffolding or formwork products,please feel free to contact me.
QINGDAO SCAFFOLDING CO.,LTD.
Best Regards/Cherry Wei
M: 0086-13355422605
TEL: +86-532-8668 1339
FAX: +86-532-8579 8559
Silakan kirim pesan Anda langsung kepada pemasok ini.
Orang-orang yang telah melihat hal ini juga telah melihat
Temukan Produk Serupa Berdasarkan Kategori
- Beranda Pemasok
- Produk
- Sistem Formwork beton
- Formwork Hijau Cepat Efisien dan Mudah Mengoperasikan Formwork Slab untuk Flatslab