• Early Stripping Head Steel Panel Formwork for Concrete Construction
  • Early Stripping Head Steel Panel Formwork for Concrete Construction
  • Early Stripping Head Steel Panel Formwork for Concrete Construction
  • Early Stripping Head Steel Panel Formwork for Concrete Construction
  • Early Stripping Head Steel Panel Formwork for Concrete Construction
  • Early Stripping Head Steel Panel Formwork for Concrete Construction
Favorit

Early Stripping Head Steel Panel Formwork for Concrete Construction

Certification: Patent Certificate
Material: Steel
Type: Slab Formwork
Paket Transportasi: Pallet
Spesifikasi: 1.8x1.2M-0.6X0.6M
Merek Dagang: GF

Hubungi Pemasok

Anggota Berlian Harga mulai 2008

Pemasok dengan izin usaha terverifikasi

Perusahaan Perdagangan

Informasi dasar.

Tidak. Model.
MB1812-MB606
Asal
China
Kapasitas Produksi
10000m2/Per Month

Deskripsi Produk

Early Stripping Head Steel Panel Formwork for Concrete Construction
 
 

Green Formwork is an advance Panel -Prop formwork system which allow EARLY STRIPPING PROCESS. It provides a suitable formwork solution to most concrete structure and component and meets the general requirements of different construction methods and conditions.

 

The system adopts the structural mechanism of a 4-leg table using puzzle-style & systematic installation approach.

Product Description

#Green Formwork - best concrete formwork solution
                                to flatslab or beam-less structure projects 


An advance aluminium/steel panel prop formwork system which allow early stripping operation. It provides suitable formwork solutions to flatslab or beam-less concrete structure projects.

Simple & Innovative 

√ Only few components : Panel - Steel fames and bamboo plywood 
                                                Prop with quick release
                                      
√ Do not require cross braces and tripods

√ Easy to transfer both horizontally and vertically 
Early Stripping Head Steel Panel Formwork for Concrete Construction
Fast & Efficient :

√ 3-4 worker team for erection,stripping and removal

√ Can acheive 60-80m2 work done per man per day .



Safe & Reliable

√ Stable system with 6 direction locking restriction

√ No human lifting above shoulder required 

Early Stripping Head Steel Panel Formwork for Concrete Construction
Till now, Green Formwork has been used in U.S.A ., Canada, Czekh republic,U.A.E, Malaysia, Indonesia,Philippines,Thailand,Burma, Cambodia.Safe,efficient,easy operating and cost-effective.
Early Stripping Head Steel Panel Formwork for Concrete Construction

Company 

QINGDAO SCAFFOLDING CO.,LTD." is the leading manufacturer and exporter in whole China for all kinds of scaffolding products and formwork systems. We export large quantity to Europe, Australia, New Zealand, U.S.A., Canada, South America and African countries. More than 20 years experience of manufacturing on scaffolding has won our customers approval and satisfaction.

Please be advised and see the attached catalogue of  the products which we are producing: 
1)SCAFFOLDING TUBES AND COUPLERS; 
2)SCREW JACKS;  
3)RINGLOCK SYSTEMS; 
4)KWIKSTAGE SYSTEMS;  
5)HAKI SYSTEMS; 
6)ADJUSTABLE STEEL PROPS  
7)FORMWORK AND FORMWORK ACCESSORIES; 
8)ALUMINIUM /STEEL FORMWORK
Early Stripping Head Steel Panel Formwork for Concrete Construction

If you have any inquiry or any projects in hand ,please feel free to contact with me .

Amelie Xing
QINGDAO SCAFFOLDING CO.,LTD.
 


 

Kirim permintaan informasi Anda langsung ke penyedia ini

*Dari:
*Untuk:
*Pesan:

Masukkan antara 20 dan 4000 karakter.

Ini bukan yang Anda cari? Posting Permintaan Sourcing SEKARANG

Temukan Produk Serupa Berdasarkan Kategori

Beranda Pemasok Produk Sistem Formwork beton Early Stripping Head Steel Panel Formwork for Concrete Construction

Anda Mungkin Juga Menyukai

Hubungi Pemasok

Anggota Berlian Harga mulai 2008

Pemasok dengan izin usaha terverifikasi

Perusahaan Perdagangan
Jumlah Karyawan
33
Tahun Pendirian
2003-09-10