• CE Alat berat Krem selang Bebas 51 mm Daya P20
  • CE Alat berat Krem selang Bebas 51 mm Daya P20
  • CE Alat berat Krem selang Bebas 51 mm Daya P20
  • CE Alat berat Krem selang Bebas 51 mm Daya P20
  • CE Alat berat Krem selang Bebas 51 mm Daya P20
  • CE Alat berat Krem selang Bebas 51 mm Daya P20
Favorit

CE Alat berat Krem selang Bebas 51 mm Daya P20

After-sales Service: 1year
Warranty: 3year
Sertifikasi: CE, ISO, SGS
Kondisi: Baru
Disesuaikan: Tidak disesuaikan
Kelas Otomatis: Otomatis

Hubungi Pemasok

Produsen/Pabrik

Tur Virtual 360°

Anggota Berlian Harga mulai 2022

Pemasok dengan izin usaha terverifikasi

Zhejiang, Cina
Importir dan Eksportir
Pemasok memiliki hak impor dan ekspor
Pilihan Pembeli Berulang Tinggi
Lebih dari 50% pembeli berulang kali memilih pemasok
Pengalaman Ekspor Bertahun-tahun
Pengalaman ekspor pemasok lebih dari 10 tahun
Kustomisasi Penuh
Pemasok menyediakan layanan penyesuaian penuh
untuk melihat semua label kekuatan terverifikasi (17)

Informasi dasar.

Tidak. Model.
P52
Struktur
Horizontal
Kapasitas Produksi
50000

Deskripsi Produk

Product description:
Model P52 CNC hose crimping machine has equipped with computer numerical control system, fast crimp and good quality. This machine features high crimp accuracy, big force, low noise and easy to operate. It makes the mould base division to be more even through the double inclined plane eight-flap mould seat equipped with a high accuracy guiding device. P52 hose crimping machine is mainly used for crimping processing for high pressure hydraulic hose assembly in the mechanical engineering. It can also be used for crimping steel pipes, especially large pipes and irregular shape pipes.

CE 51mm Free Dies Power P20 Hose Crimping Machine
Troubleshooting
Trouble phenomena Trouble reason Eliminating method
Machine has not action Oil tank has not been filled with oil Fill oil as per requirement
Motor rotation direction is not correct Regulate two phase lines
Electric trouble Overhaul electric circuits
Scale is damaged The scale is fastened on the oil cylinder end face by the screw Regulate the scale as per the instruction to make scale to telescope freely
Conductor at scale location is connected with scale Anew connect the scale conductor to make it to be insulated from scale base
Electric trouble Overhaul electric circuits and electric elements
Scale conductor cutting Anew connect scale
System pressure is excessively low Adjust buckling pressure-regulating valve
No buckling The valve core of solenoid reversal valve is seizured by foreign matters Dismount solenoid reversal valve, use gasoline to clean the valve core.
Electric trouble Overhaul electric circuits
Mould is not opened Opening mould pressure is excessively low Adjust opening mould pressure regulating valve
Electric trouble Overhaul electric circuits
Big noise Installation is not stable Conduct horizontal stable installation
Hydraulic oil is excessively dirty Filter or change it
Filter is blocked Use gasoline to clean the filter
Mould base crawls Gas in the hydraulic oil has not bee exhausted completely Suitable unscrew the bleed screw, make the piston in the oil cylinder to move back to last position to exhaust gas, then screw down bleed screw.
Lubrication is poor Smear grease on the working inclined face of mould base
Oil leakage Joint is not tightened closely Tighten the oil pipe joint
Sealing washer is damaged. Replace sealing washer.

 

Kirim permintaan informasi Anda langsung ke penyedia ini

*Dari:
*Untuk:
*Pesan:

Masukkan antara 20 dan 4000 karakter.

Ini bukan yang Anda cari? Posting Permintaan Sourcing SEKARANG