• Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing
  • Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing
  • Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing
  • Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing
  • Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing
  • Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing
Favorit

Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing

Proses manufaktur: Penempaan
Perlakuan Permukaan: Sembur-Cat
Tekanan Pengoperasian: Tekanan Atmosfer
Material: Baja cor
tipe alat berat: laba-laba tabung api
aplikasi1: komponen mesin energi & pertambangan/minyak bumi

Hubungi Pemasok

Anggota Berlian Harga mulai 2022

Pemasok dengan izin usaha terverifikasi

Produsen/Pabrik & Perusahaan Dagang
  • Ringkasan
  • Product Description
  • Hot Sales Products
  • Company Profile
  • Packaging & Shipping
  • FAQ
Ringkasan

Informasi dasar.

Tidak. Model.
laba-laba tabung api
Paket Transportasi
Wooden Box
Spesifikasi
CUSTOM MADE
Merek Dagang
JX PETRO
Asal
Dongying
Kode HS
84314310
Kapasitas Produksi
2000PCS/Month

Deskripsi Produk

Product Description

API Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing Spiders

Tubing spider and API spiders

TS-100 tubing /casing spiders are tools for handling drill collars, casings, tubings and slick pipes. Both the spider body and slips are made of high-quality alloy steel and heat-treated especially. The spiders are not so weighty and easy to operate. They are designed and manufactured according to API Spec 7K specification for drilling and well servicing equipment.

The API spider same API Split master bushing with a diameter of 4in/ft on the diameter taper. The spider is made of high -quality alloy steel and heat-treated especially. The Spider are easy to operate
 Features 
  1. TS tubing spider Interchangeable slip body inside the spider
  2. API spider is made of alloy steel according to API standard 
  3. NDT test with national best standard 
  4. Quality assured, warranty 6month after sale, spare parts are traceable to provide
API Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing Spiders


Specification 
 
Model Applicable diameter of tubular(in) Rated capacity (short tons)
TS 3-1/2"-100 1.05 ~ 3-1/2" 100
TS 5-1/2"-100 2-3/8" ~ 5-3/4" 100
8-5/8" API spider  2-3/8" ~ 8-5/8" 100
9-5/8" API spider  9-5/8" ~ 10-3/4" 150
API Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing SpidersAPI Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing SpidersAPI Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing SpidersAPI Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing Spiders
Hot Sales Products

API Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing Spiders

Company Profile

API Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing SpidersAPI Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing SpidersAPI Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing Spiders

Packaging & Shipping

API Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing Spiders

FAQ

API Spiders API 7K Drilling Manual Ts 3-1/2-100 Tubing/Casing Spiders

1) How can I place order?

A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?

A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.

3) What's the order procedure?

A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?

A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?

A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.  

Kirim permintaan informasi Anda langsung ke penyedia ini

*Dari:
*Untuk:
*Pesan:

Masukkan antara 20 dan 4000 karakter.

Ini bukan yang Anda cari? Posting Permintaan Sourcing SEKARANG

Temukan Produk Serupa Berdasarkan Kategori

Beranda Pemasok Produk Menangani Alat Laba-laba API Buku Petunjuk Pengeboran api 7K TS 3-1/2-100 Tbing/casing