Rolling Body: | Roller Bearings |
---|---|
The Number of Rows: | Single |
Outer Dimension: | Small and Medium-Sized (60-115mm) |
Material: | Chrome Steel/Gcr-15 |
Spherical: | Non-Aligning Bearings |
Load Direction: | Radial Bearing |
Pemasok dengan izin usaha terverifikasi
REFERENSI SILANG | |||
SKFNO | NUM309NR C4 | ||
REFERENSI OEM | |||
TEGANGAN | 183688 / 183698 | ||
POSISI | |||
Pilot pinion bevel | |||
d (mm.) | D (mm.) | T (mm.) | Berat (kg.) |
45 | 100 | 25 | 0.95 |
d | D | C/B | No. Bearing | d | D | C/B |
45 | 100 | 36 | NJ 309 VHNRC4 | 45 | 100 | 25 |
45 | 100 | 25 | 309 NR.C4 | 45 | 100 | 25 |
45 | 100 | 25 | NPK 2205 S13 | 25 | 52 | 8 / 20.6 |
25 | 52 | 8 / 20.6 | NJ 308 VH.NR.C4 | 40 | 90 | 23 |
27.5 / 28- | 54.6 | 22 | BC1B 319552 | 80 | 150 | 27.5 / 28 |
40 | 90 | 23 | 635245 | 60 | 130 | 31 |
80 | 150 | 27.5 / 28 | 805449 | 65 | 140 | 33.35 |
60 | 130 | 31 | 315070 B | 60 | 110 | 22 |
65 | 140 | 33.35 | 510148 A | 35 | 80 | 23 |
60 | 110 | 22 | F210540 | 40 | 90 | 27 / 24.9 |
35 | 80 | 23 | BC1B 246747 | 38 | 90 | 23 / 22 |
40 | 90 | 27 / 24.9 | 314984 | 45 | 95 | 28/ 32 |
38 | 90 | 23 / 22 | 524213 | 27.5 / 28- | 150 | 28 |
45 | 95 | 28/ 32 | F-45864.1 | 35 | 80 | 22 |
27.5 / 28- | 150 | 28 | NPK 2205 NR | 25 | 52 | 18 |
35 | 80 | 22 | 2206 VF 153B | 30 | 62 | 20 |
84.98 | 150 | 27.5 / 28 | N 2210 W | 50 | 90 | 23 |
25 | 52 | 18 | BC1B 635251 | 25 | 52 | 21 |
30 | 59 | 3.0 / 15 | RU 9008 UM | 40 | 90 | 25 |
30 | 62 | 20 | MU 1308 UM | 40 | 90 | 23 |
50 | 90 | 23 | RU 1570 UM | 35 | 72 | 20.6 |
25 | 52 | 21 | BC1B 312219 | 80 | 140 | 33.5 |
49.93 | 80 | 15 | 804339 | 60 | 110 | 28 |
30 | 61.935 | 19 | 510148 B | 34.993 | 80 | 23 |
40 | 90 | 25 | 508204 E.TPKP | 45 | 100 | 25 |
40 | 90 | 23 | 30 | 61.935 | 23.813 | |
35 | 72 | 20.6 | BC1B 322467 | 50 | 100 | 25 |
80 | 140 | 33.5 | BC1B 322172 A | 60 | 116 | 28 |
60 | 110 | 28 | BC1B 320308 A | 45 | 100 | 31 |
34.993 | 80 | 23 | BC1B 319546C / VB017 | 65 | 140 | 33 |
45 | 100 | 25 | F 43710.1 | 35 | 62 | 16.7/19 |
30 | 61.935 | 23.813 | M 1206 EL | 62 | 16 | |
50 | 100 | 25 | F 237594 | 80 | 26.5 | |
60 | 116 | 28 | BC1 0058 | 50 | 110 | 32.3/27 |
15.875 | 47 | 14 | BC1 0125 | 50 | 110 | 32.3/27 |
45 | 100 | 31 | 580989 | 38 | 94 | 33/31.5 |
65 | 140 | 33 | MU 1307 TM | 35 | 80 | 21 |
35 | 62 | 16.7/19 | MUS 1307 TM | 30 | 80 | 21 |
38 | 83 | 25 | 31 RUK SS 2N 2T | 55 | 20 | |
62 | 16 | 566616 B | 80 | 150 | 27.5 / 28 | |
80 | 26.5 | 540106 | 60 | 130 | 31 | |
50 | 110 | 32.3/27 | 512099 TVP2 | 60 | 110 | 22 |
50 | 110 | 32.3/27 | F 45814 | 45 | 95 | 28/ 32 |
38 | 94 | 33/31.5 | 805450 | 80 | 140 | 33.5 |
35 | 80 | 21 | ETR 122205 | 30 | 61.935 | 23.813 |
30 | 80 | 21 | 805262 | 45 | 100 | 36 |
55 | 20 |
T:apa layanan dan garansi purna-jual Anda?
J: Kami berjanji untuk menanggung tanggung jawab berikut bila ditemukan produk yang cacat:
garansi 1.12 bulan dari hari pertama menerima barang;
2. Penggantian akan dikirim dengan barang-barang pesanan Anda selanjutnya;
3. Mengembalikan uang untuk produk yang cacat jika pelanggan memerlukannya.
T:Apakah Anda menerima pesanan ODM&OEM?
J: Ya, kami menyediakan layanan ODM&OEM bagi pelanggan di seluruh dunia, kami juga menyesuaikan kotak OEM dan mengemas sebagai persyaratan Anda.
T:apa yang ada dalam MOQ?
J: MOQ adalah 10 potong untuk produk-produk terstandar; untuk produk-produk khusus, MOQ harus dinegosiasikan sebelumnya. Tidak ada MOQ untuk pesanan sampel.
T:berapa lama waktu yang dibutuhkan untuk memimpin?
J: Waktu tunggu sementara untuk pesanan sampel adalah 3-5 hari, untuk pesanan massal adalah 5-15 hari.
T:Apakah Anda menawarkan sampel gratis?
J: Ya kami menawarkan sampel gratis kepada distributor dan grosir, namun pelanggan harus mengangkut barang. Kami TIDAK menawarkan sampel gratis untuk pengguna akhir.
T:bagaimana cara menempatkan order?
A: 1. Kirimkan model, merek, dan jumlah dalam bentuk yang sama kepada kami, cara pengiriman bearing, dan kami akan menyampaikan harga terbaik kami untuk Anda;
2.Protbentuk Faktur yang dibuat dan dikirim kepada Anda sesuai dengan harga yang disetujui kedua bagian itu;
3. Pembayaran setelah mengkonfirmasikan PI dan kami akan mengatur produksi;
4. Saldo dibayar sebelum pengiriman atau setelah salinan Bill of Loading.
Pemasok dengan izin usaha terverifikasi