• Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber
  • Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber
  • Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber
  • Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber
  • Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber
  • Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber
Favorit

Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber

Usage: Bridge, Culvert, Tunnle Construction
Material: Natural Rubber
tipe: persiapan konkret
dia (dia): 450, 600, 900, 1200 mm, atau khusus
panjang: 10m, 15m, 20m, 25m atau dikustomisasi
ukuran dan bentuk khusus: berbentuk bulat, persegi, ganjil, atau dikustomisasi

Hubungi Pemasok

Anggota Emas Harga mulai 2015

Pemasok dengan izin usaha terverifikasi

Klasifikasi: 5.0/5
Hebei, Cina
Pilihan Pembeli Berulang Tinggi
Lebih dari 50% pembeli berulang kali memilih pemasok
Pengalaman Ekspor Bertahun-tahun
Pengalaman ekspor pemasok lebih dari 10 tahun
Tim Berpengalaman
Pemasok memiliki 5 staf perdagangan luar negeri dan 5 staf dengan lebih dari 6 tahun pengalaman perdagangan luar negeri
untuk melihat semua label kekuatan terverifikasi (23)

Informasi dasar.

Tidak. Model.
precast formwork 023
kelonggaran
konstruksi terowongan/pemusnahan/ berkas sinar timur tengah
tersertifikasi
iso 9001, hg
pesanan mendesak
ya
fitur
kain karet+kekuatan, waktu serice yang panjang
tipe bisnis
pabrikan pabrik
merek dagang
karet jingtong
Paket Transportasi
Plastic Bag, Then Pallet Delivery
Spesifikasi
ISO, CE, SGS
Merek Dagang
JINGTONG
Asal
Hengshui, China
Kode HS
40169990
Kapasitas Produksi
10000PCS Per Month

Deskripsi Produk

Description of concrete precast formwork:

Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong RubberConcrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong RubberConcrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong RubberConcrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong RubberConcrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber

concrete precast formwork is polymer composite materials processing product, it is the use of high-strength synthetic fiber fabrics ithstand the force skeleton, inside and outside the vulcanized synthetic rubber adhesive protective layer of tape to do, according to the design dimensions of a high temperature curing process made specifications, more size, more pressure rubber inflatable balloon shapes, depending on the size of the bridge, gutter size, tunnel size, inflatablepressure reaches the standard post-tensioned concrete pre-casting project tensioned beams, the initial  setting of concrete grade to be after drain rubber inflatable balloon gas,  pulled out after the rubber inflatable balloon, scrub clean after storage, until the nextre-use, with a high compressive strength, good flexibility, strong tightness, and used repeatedly, is a new lower cost bridge construction,  water conservancy,  the tunnel project costs,  and increase the speed of the amount of pre-engineering concrete products supporting products.
 

Features of our concrete precast formwork : 

  1.one strength cloth layer between two rubber layers, better tenslile strength, prevent explosion when you inflate, wear resistant.

2.Vulcanized production technology, not easy to crack.
3.More than 80 times reused servise life time.
4.Lighter weight, easy installation and transport.
5.Full set of accessaures, you can install directly when you got the goods.
6.factory manufacture, customized size and shapes.
 

Section Shape of concrete precast formwork :

 
 
Specification of concrete precast formwork :
 

1> Diameter (D)   : From 0.1m to 2.2 m.

2>Total Length (TL) : From 0.5 m to 28m.

3>Other specification also available upon customer's request.

 

Diameter(mm)

Pressure(Mpa)

150

0.08

160~190

0.08

200~220

0.07

230

0.06

240~280

0.05

300~370

0.045

380~480

0.04

500~520

0.035

550~600

0.03

620~680

0.025

700

0.02

620~680

0.025

700

0.02


Please see our material below:


Some concrete precast formwork were exported to Kenya, Tanzania, Singapore, Sudan etc for your reference:
 
Store and repair of concrete precast formwork:

1.Rinse the concrete precast formwork with water, put them in ventilated and dry place,avoid oil,acid,alkali etc.
2.Please make sure the sharp and hard things wouldn't scarify the inflatable mandrel.
3.Keep the surface of the inflatable mandrel clean after you finish the project, that will expandits service time. It can be used 70 to 80 times if you can correctly store and use.  
4.If it leaked,polish it with grinding wheel,brush glue and paste the patch.
When the air leak place is longer than 50cm, it need to be repaired under vulcanization.


More details please contact me directly!

HENGSHUI JINGTONG RUBBER CO.,LTD
Add:NanwangzhuangVillage,Taocheng District, Hengshui City,China.
Web:www.hsjtxj.en.made-in-china.com  | hsjtxj.en.made-in-china.com

Kirim permintaan informasi Anda langsung ke penyedia ini

*Dari:
*Untuk:
*Pesan:

Masukkan antara 20 dan 4000 karakter.

Ini bukan yang Anda cari? Posting Permintaan Sourcing SEKARANG

Temukan Produk Serupa Berdasarkan Kategori

Beranda Pemasok Produk Karet Karet pengisi angin ban Balon Karet Concrete Precast Formwork for Culvert/Bridge/Tunnle Jingtong Rubber