• Jzl120 Hydraulic Pile Driver for Construction Projects
  • Jzl120 Hydraulic Pile Driver for Construction Projects
  • Jzl120 Hydraulic Pile Driver for Construction Projects
  • Jzl120 Hydraulic Pile Driver for Construction Projects
  • Jzl120 Hydraulic Pile Driver for Construction Projects
  • Jzl120 Hydraulic Pile Driver for Construction Projects
Favorit

Jzl120 Hydraulic Pile Driver for Construction Projects

After-sales Service: Provided
Warranty: 1 Year
Tipe: Penggerak tekan Tumpukan
Tipe Penggerak Tumpukan Tekanan: Penggerak Tumpukan Hidraulik
Tipe Hammer Tumpukan: Hammer Hidraulik
Sumber Daya: Elektrik

Hubungi Pemasok

Tur Virtual 360°

Anggota Berlian Harga mulai 2009

Pemasok dengan izin usaha terverifikasi

Perusahaan Grup

Informasi dasar.

Tidak. Model.
JZL120
Daya Motor
235kw
Noise (kebisingan)
Tanpa Noise
Sertifikasi
CE, ISO 9001:2000
Kondisi
Baru
diameter lubang maksimum
800 mm
kedalaman pengeboran maksimum
31 m.
gaya tarik yang diizinkan
800 khn
Paket Transportasi
Container
Spesifikasi
13.4*6.2*38.9m
Merek Dagang
FYG
Asal
China
Kode HS
8430100000

Deskripsi Produk

Product Description

1. Simple maintenance
2. The vertical degree of the piling is high.
3. It walks neatly and quickly with high efficiency
JZL Serise of dynamoelectric pedrail piling-frame is a new kind of piling product with single property right manufactured by Famhyuam Group Co., The products focus on all advantages of two kind of piling-frame at present in domestic selt-pedrail piling walking-pedrail piling-frame.
Items JZL60 JZL90 JZL120
Height of the leader(m) 30.5 36.5 36.8
Leader bearing length Forward: 5 degreeds/ Backward: 3 degreeds
Oriented central distance(mm) Forward: 600/ Backward: 330
Auger lifting capacity(kN) 400 640 800
Main lifting speed(m/min) 2.0/2.6/3.2 1.8/2.2/2.6 1.2/1.6/2.0
Slewing speed(r/min) 0.37 0.36 0.38
Traveling speed(km/h) 0.25 0.28 0.28
Maximum drilling diameter(mm) 800 800 1000
Maximum drilling depth(m) 25 31 31
Total weight(t) 58 70 90
Overall size(m) 12/5.5/32.6 13.6/6/38.5 13.4/6.2/38.3
Jzl120 Hydraulic Pile Driver for Construction ProjectsJzl120 Hydraulic Pile Driver for Construction ProjectsJzl120 Hydraulic Pile Driver for Construction Projects

Kirim permintaan informasi Anda langsung ke penyedia ini

*Dari:
*Untuk:
*Pesan:

Masukkan antara 20 dan 4000 karakter.

Ini bukan yang Anda cari? Posting Permintaan Sourcing SEKARANG

Orang-orang yang telah melihat hal ini juga telah melihat

Temukan Produk Serupa Berdasarkan Kategori

Beranda Pemasok Produk menumpuk alat berat pengeboran Jzl120 Hydraulic Pile Driver for Construction Projects

Anda Mungkin Juga Menyukai

Hubungi Pemasok

Tur Virtual 360°

Anggota Berlian Harga mulai 2009

Pemasok dengan izin usaha terverifikasi

Perusahaan Grup
Jumlah Karyawan
1857
Tahun Pendirian
1999-07-07